Draw on a skeleton.
RigSketch puts a fully rigged, animated 3D figure under your paper. Pick a walk, a jump, a punch or a fall, scrub it to the frame you want, and draw your character straight over it with a stylus. Step forward and the figure moves with you while your last drawing stays as a ghost.

Made for animators who draw.
A real rig under the paper
Two full-finger mannequins with about 90 clips between them, plus a base character, a knight, nine quadrupeds, five birds, five robots, a dragon and a skeleton. All open-licence.
Pose, draw, step, repeat
Keyframe stepping, holds, onion skin that counts drawings rather than frames, per-frame camera memory, and a camera lock so a stray drag never moves your reference.
A proper drawing engine
Pressure brushes with stabiliser and symmetry, layers with blend modes and clipping, selections and transforms, fill with gap closing, gradients, smudge.
Bring your own moves
Drop any glTF or FBX character in as a rig. Drop animation files, including your own Mixamo downloads, into a clip library that remembers them.
Six views, true ortho
A view cube snaps to front, back, sides, top and bottom. An orthographic camera means no perspective drift while you trace. Ruler and perspective grids with snapping.
Export anywhere
PNG sequences, sprite sheets, GIF, MP4 and WebM, with or without the rig. Projects are plain zips of PNGs you can open with anything.
Screenshots




What ships in the box
- 28 rigged models, about 340 animation clips, every one CC0 or CC BY (credits in the app)
- Walk, jog, sprint, crouch, jumps, rolls, punches and hooks, sword, shield, pistol, picking up, getting up, sitting, dance, hits, deaths
- Kicks on the mechs and the GDQuest mannequin; horses, wolves, cats, dogs, a fox, cows, zebras, sheep, a pug; eagle, pigeon, chicken, rooster
- Import any glTF or FBX character; a persistent clip library for your own downloads
- Pressure brushes, stabiliser, symmetry, layers, blend modes, clipping, selections, fills, gradients, smudge
- Holds, onion skin, keyframe stepping, per-frame camera memory, camera lock, motion that stays centred or travels
- View cube, orthographic camera, ruler and perspective grids with snapping
- PNG sequence, sprite sheet, GIF, MP4, WebM export; autosave and crash recovery
- Runs full-screen on a drawing monitor; a pen and a finger can do different things
- Windows 10 and 11, 64-bit; a pressure-sensitive stylus is strongly recommended
Buy it once. Own it.
Direct from rigsketch.org
Pay by card through Stripe, download straight away, and get a licence key for re-downloads. Best deal for us, same price for you.
Opening soon.
Steam
Automatic updates through the Steam client, tied to your Steam account. Coming soon.
Steam store pageitch.io
A direct download with no launcher; the itch app can keep it updated. Coming soon.
itch.io page$19.99 USD, one-time. The same build everywhere.
